• September

    25

    2024
  • 190
  • 0
Emergency Boarding Up Service

Emergency Boarding Up Service

Project Overview:

We received an urgent request on a Friday afternoon to assist with securing a pub in Central London where squatters had recently been evicted. Our team responded promptly and attended the site the following day to secure the property for the landlord.

Process:

  • Site Assessment:
    Early on Saturday morning, our team arrived at the property to assess the situation. We conducted a thorough inspection to identify key entry points that squatters had been using to access the building.
  • Material Procurement:
    After measuring the affected areas, we sourced the necessary materials to ensure the property could be properly secured.
  • Boarding Up:
    There were five critical areas of entry that required attention. Over the course of two days, we focused on securing each of these points, installing durable boarding to prevent any further unauthorised access.
  • Final Inspection:
    By the end of the weekend, the property was fully secured. We conducted a final walkthrough with the landlord to ensure all entry points were reinforced and the building was safe.

Outcome:

The property was secured within two days, providing peace of mind to the landlord. The site was successfully handed back, and no further incidents of trespassing occurred.

LEAVE A COMMENT

Your comment will be published within 24 hours.

COST CALCULATOR

Use our form to estimate the initial cost of renovation or installation.

REQUEST A QUOTE
Latest Posts
Most Viewed
Text Widget

Here is a text widget settings ipsum lore tora dolor sit amet velum. Maecenas est velum, gravida Vehicula Dolor

Categories

Archives

© Copyright 2024 Regener8 Solutions Privacy Policy